top of page

Certified Solar Panel Removal and Reinstallation in Fort Walton Beach, FL: How a Detach and Reset Works

Writer: A&M Construction
A&M Construction
Oct 19
4 min read

Updated: Nov 2

A detach and reset is the process of removing a solar array from a roof, replacing the roof underneath, and then reinstalling the array to ensure it functions as it did before. In Fort Walton Beach, Florida, this task requires two separate trades and licenses, which can make pricing challenging for homeowners. A&M Construction of NW Fla holds both necessary licenses: Florida Certified Roofing Contractor CCC1326077 and Florida Certified Solar Contractor CVC57246. This means you have one company, one schedule, and one point of responsibility if there are any issues with the roof or the solar array. Here’s how the work is done.


Rooftop solar panel array on a home in the Fort Walton Beach, FL area

Why Licensing Matters


Florida defines contractor categories by their scope of work. A roofing contractor covers the roof covering, the deck, attachments, and related work. Meanwhile, a solar contractor focuses on the installation, alteration, repair, maintenance, relocation, or replacement of solar panels and their equipment. These definitions are distinct, and the state’s rule states that a contractor certified under that chapter does not need to hire a separate solar contractor for work within their licensed scope.


For homeowners, this means it’s essential to ask for the license that covers the job you’re hiring for. Always check it yourself. Both definitions are outlined in section 489.105 of the Florida Statutes. You can confirm any Florida license number, including ours, in about thirty seconds using the DBPR license verification tool. If a company cannot provide a license number, it’s a red flag.


The Seven Steps of a Detach and Reset


  1. Document the Array: Before any work begins, take photographs of every row, the racking layout, wire runs, the inverter, and current production figures. This documentation ensures the system is reinstalled correctly.


  2. Shut Down the System: Panels generate voltage whenever there is daylight. The array must be de-energized and isolated in sequence before any hardware is removed.


  3. Remove Panels and Racking: Carefully take off the panels and racking, storing both properly. Panels should be stored flat, off the ground, and protected from the weather. Racking should be labeled by row for easy reinstallation.


  4. Reroof the Entire Plane: It’s crucial to replace the entire roof section, not just the area around the array. This includes tearing off the old material, inspecting and refastening the deck, sealing seams, and installing new underlayment, flashing, and covering. Old mount penetrations are permanently sealed.


  5. Install New Mounts: Each mount is a new penetration through the new roof. They must be installed on rafters and flashed properly. This step is vital for preventing leaks in the future.


  6. Reinstall Racking and Panels: Reinstall the racking and panels according to the documented layout. Inspect connectors and replace any damaged or corroded hardware.


  7. Bring the System Back Up: Finally, restore power to the system and confirm production levels. Compare the output against the baseline established in step one. If any issues arise, they can be addressed immediately.


Residential roof styles A&M Construction reroofs in Fort Walton Beach, FL, including homes with solar

Permits and Common Pitfalls


Reinstalling an array is not seen as a continuation of the old installation. It requires its own permit and inspection, separate from the reroof permit. Requirements can vary by jurisdiction. In Okaloosa County, roof and reroof permits are processed through the Fast Lane and typically issued the next day. Applications are submitted via the online Customer Service Support portal, and the county adheres to the 2023 Florida Building Code, 8th Edition, with ASCE 7-22 wind criteria. Current requirements can be found on the Okaloosa County permitting page.


A common issue for homeowners is sequencing. If the roofer finishes on a Friday and the array reset isn’t scheduled immediately, the panels may sit in a garage for weeks. During this time, homeowners pay full retail for power. Booking the roof and the reset as one job with one schedule is a practical reason to choose a contractor licensed for both tasks.


Frequently Asked Questions


How long will my panels be off the roof?

For a typical single-family home where the roof and reset are scheduled together, the panels are usually off for days, not weeks. Factors include the size of the array, the complexity of the roof, and inspection timing. Summer storms can also affect schedules.


Will removing the panels void my solar warranty?

This depends on the terms of your warranty. Some solar warranties require that work on the array be performed by a licensed party or that the company be notified in advance. It’s best to contact your solar provider to clarify their requirements and get it in writing.


What if my panels are leased?

If you have a lease or power purchase agreement, the leasing company usually has specific rules about who can work on the equipment. It’s essential to start that conversation early, as it can delay the project.


Can you just roof around the panels?

We do not recommend this approach. Roofing around an array leaves old material and penetrations under the panels, which cannot be inspected afterward. If the roof needs replacing, the area under the array should be replaced as well.


What happens to the old mounting holes?

Old mounting holes are sealed as part of the new roof assembly. New mounts are installed on rafters and flashed into the new roof. Reusing existing penetrations can lead to leaks, which are difficult to locate.


Is this covered by insurance after a storm?

Sometimes, the detach and reset is considered a necessary cost of replacing a storm-damaged roof. However, this varies by policy and carrier. It’s crucial to ask your adjuster about it specifically and ensure it’s included in the estimate before work begins.


One Company, Both Licenses, One Schedule


If your roof needs replacement and has an array on it, we will inspect it, photograph it, and provide a quote for both the roof and the detach and reset. This way, there’s no gap between contractors and no confusion about responsibility. Check out our solar roofing services, learn more about roof replacement with solar panel removal, or see what the permit process looks like here. Family-owned in Mary Esther since 1994.


Contact A&M Construction or call 850-803-0650.


A&M logo with blue roof shapes and orange window icons above large orange A&M text on a white background

CONTACT US

2225 W Highway 98, Mary Esther, FL

850-803-0650

Comments


bottom of page